Mark, with regard to Boeing SB737-55A1070, two pages of compliance was emailed, It is a little odd that according to table5 (page2) putty has to be applied to the elevator tab hinge bolt and the bolt has to be inspected initially???? before every flight as a preflight task????!!!!